Bm Holding

Hydropower

Starting with Turkey’s first B.O.T. hydropower scheme back in 1986, BM has constructed, operated and transferred a portfolio of 8 HEPPs with a total annual power generation of 250 GWh.

Some of the innovative features implemented in these Project include the following:

  • Conversion of a dam into a multi-level cascade system, leading to %90 reduced expropriation,
  • Rubber spillways and flush power house design for reduced environmental impact,
  • Conversion of numerous HEPP surface water transmission lines to underground for reduced environmental impact, expropriation area and easier operation,